Maverick2 Maintenance 30 April 2019

Posted by Matthew Edeker on Apr 22, 2019 12:37:20 PM

Updated on Apr 30, 2019 7:02:45 PM

Maverick2 back in production at 5:00pm from system maintenance.

Original Posting

Maverick2 will be unavailable from 8:00 a.m. to 5:00 p.m. (CT) on April 30th, 2019. During this time, Maverick2 will be updated to CentOS 7.6, the default loaded python will be changed from "python" to "python2", and the default loaded compiler will be changed from intel/17.0.4 to intel/18.0.2.