Lonestar5 Maintenance 21 November 2017

Posted by Matthew Edeker on Nov 6, 2017 11:05:12 AM

LoneStar5 will not be available from 8 a.m. to 17:00 p.m. (CT) on Tuesday, 21 November 2017. Maintenance on the Slurm scheduler and Cray Development Toolkit will be performed during this time.



LoneStar5 will not be available from 8 a.m. to 17:00 p.m. (CT) on Tuesday, 21 November 2017. Maintenance on the Slurm scheduler and Cray Development Toolkit will be performed during this time.



Lonestar5 Status October 31, 2017

Posted by David Littrell on Oct 17, 2017 9:28:07 AM

LoneStar5 will not be available from 8 a.m. to 17:30 p.m. (CT) on Tuesday, 31 October 2017. System maintenance for installing Patches and Field notices will be performed during this time.

Updated on Oct 31, 2017 2:49:33 PM

Lonestar5 is back in production. 

Original Posting

LoneStar5 will not be available from 8 a.m. to 17:30 p.m. (CT) on Tuesday, 31 October 2017. System maintenance for installing Patches and Field notices will be performed during this time.

Stampede2 Extended Outage Begins Friday, 20 Oct 2017 at 8am CDT

Posted by Jason Allison on Oct 17, 2017 2:50:15 PM

Stampede2 will be unavailable for a four-day period beginning Friday, 20 Oct 2017 at 8 am CDT. This extended outage will allow: (1) full system science and benchmarking runs; as well as, (2) configuration, integration, and testing activities to prepare for Stampede2 “Phase 2” deployment. Phase 2...

Updated on Oct 23, 2017 4:49:37 PM

The Stampede2 system maintenance will need to be extended until at least 6PM CDT tomorrow to finish the work of integrating the phase 2 nodes into the system.


Original Posting

Stampede2 will be unavailable for a four-day period beginning Friday, 20 Oct 2017 at 8 am CDT. This extended outage will allow: (1) full system science and benchmarking runs; as well as, (2) configuration, integration, and testing activities to prepare for Stampede2 “Phase 2” deployment.

Phase 2 will feature the addition of 1,736 “Skylake” Xeon nodes to the system. Stampede2 will be completely unavailable during the maintenance window. We expect to reopen the KNL nodes to general use by 6 pm, Monday, 23 Oct 2017.  

Please submit any questions you have via the TACC User Portal:
https://portal.tacc.utexas.edu/tacc-consulting

MPI Foundations I and II - Oct 6th, 2017 - Space Available

Posted by Jason Allison on Oct 4, 2017 2:42:54 PM

We still have space available for this Friday's MPI Foundations I and II training events. Please register ASAP to avoid missing out on this opportunity. Local attendees are strongly encouraged to attend in-person. To register and for more information please visit:...

We still have space available for this Friday's MPI Foundations I and II training events. Please register ASAP to avoid missing out on this opportunity. Local attendees are strongly encouraged to attend in-person.

To register and for more information please visit: https://portal.tacc.utexas.edu/training

Lonestar5 Maintenance 26 September 2017

Posted by Sergio Leal on Sep 14, 2017 9:05:39 AM

LoneStar5 will not be available from 7:00 a.m. to 5:00 p.m. (CT) on Tuesday, 26 September 2017. We will be doing maintenance on the DDN hardware supporting the /scratch filesystem.

Updated on Sep 26, 2017 8:41:22 PM

LoneStar5 has returned to production. Login nodes and queues are open. Vlogins are still down and are planned to be restored tomorrow.



Thank you for your patience.

-TACC Team

Updated on Sep 26, 2017 5:18:12 PM

LoneStar5 is not returning to production on schedule after today's maintenance. The issues relating to /scratch filesystem were correctly resolved, however, required security patches are causing us to prolong the maintenance. We apologize for the inconvenience.

 -TACC Team

Original Posting

LoneStar5 will not be available from 7:00 a.m. to 5:00 p.m. (CT) on Tuesday, 26 September 2017. We will be doing maintenance on the DDN hardware supporting the /scratch filesystem.

Lonestar5 Status September 20, 2017

Posted by David Littrell on Sep 20, 2017 1:04:16 PM

LoneStar5 has been returned to production and the queues and login nodes are available for use. We apologize for the inconvenience of having extended the maintenance window. We experienced hardware problems with Cray cabinet controllers as well as hardware issues with the /scratch shared...

LoneStar5 has been returned to production and the queues and login nodes are available for use. We apologize for the inconvenience of having extended the maintenance window. We experienced hardware problems with Cray cabinet controllers as well as hardware issues with the /scratch shared filesystem. So please note that there will be performance degradation on /scratch until raid arrays are rebuilt over the next few hours. If possible please limit your IO on /scratch.

Lonestar5 Maintenance 19 September 2017

Posted by Jacob Getz on Sep 5, 2017 3:04:46 PM

LoneStar5 will not be available from 8 a.m. to 12:00 p.m. (CT) on Tuesday, 19 September 2017. Cray patches and field notices will be installed during this maintenance.


-TACC Team

Updated on Sep 19, 2017 4:14:34 PM

Today's Lonestar5 maintenance has been extended beyond the original timeframe. There is currently not an estimated completion time. User News will be updated when more information is available.


-TACC Team

Original Posting

LoneStar5 will not be available from 8 a.m. to 12:00 p.m. (CT) on Tuesday, 19 September 2017. Cray patches and field notices will be installed during this maintenance.


-TACC Team

October 2017 TACC Training Events

Posted by Jason Allison on Sep 15, 2017 4:14:45 PM

I am pleased to announce the following training events are being offered to both in-person and webcast participants for October 2017. Local participants are strongly encouraged to attend in person. 10/4/17 - Introduction To Hadoop And Spark On Wrangler 10/6/17 - MPI Foundations I and MPI...

I am pleased to announce the following training events are being offered to both in-person and webcast participants for October 2017. Local participants are strongly encouraged to attend in person.

10/4/17 - Introduction To Hadoop And Spark On Wrangler
10/6/17 - MPI Foundations I and MPI Foundations II
10/11/17 - Introduction to Scala/Spark
10/18/17 - Data Analysis Using Hadoop/Spark

To register and for more information please visit: https://portal.tacc.utexas.edu/training

Training: Introduction to OpenMP using the Interactive Parallelization Tool (IPT)

Posted by Jason Allison on Aug 24, 2017 4:40:22 PM

September 14th, 2017 1pm-5pm CT Texas Advanced Computing Center ACB 1.104 J.J. Pickle Research Campus 10100 Burnet Rd. Austin, TX 78758 OpenMP is one of the most popular paradigms to exploit the now ubiquitous manycore and multi-core processors. In this beginner-level training session, we will...

Updated on Sep 12, 2017 2:29:55 PM

We still have spaces available for the Introduction to OpenMP using the Interactive Parallelization Tool (IPT) September 14th, 2017. Please register ASAP to avoid missing out on this opportunity.

Original Posting

September 14th, 2017 1pm-5pm CT
Texas Advanced Computing Center
ACB 1.104
J.J. Pickle Research Campus
10100 Burnet Rd. Austin, TX 78758

OpenMP is one of the most popular paradigms to exploit the now ubiquitous manycore and multi-core processors. In this beginner-level training session, we will provide an overview of the basic concepts of OpenMP. We will introduce the trainees to the Interactive Parallelization Tool (IPT) that is designed for parallelizing serial C/C++ programs semi-automatically. The participants in the training session will be introduced to OpenMP and will learn to use IPT for parallelizing their C/C++ applications.

Prerequisites: Experience working in a Linux environment, and familiarity with C/C++/Fortran or any other programming language.

We are offering the training to both in-person and webcast participants. Local participants are strongly encouraged to attend in person.

For more information and to register for either the in-person or webcast session, please visit:
https://portal.tacc.utexas.edu/training#/user?training=upcoming

Lonestar5 Status August 29, 2017

Posted by David Littrell on Aug 10, 2017 10:09:32 AM

LoneStar5 will not be available from 8 a.m. to 5:00 p.m. (CT) on Tuesday, 29 August 2017 due to maintenance. 

Updated on Aug 28, 2017 8:32:43 AM

The LoneStar5 maintenance scheduled for 29th Aug is being postponed and a future date is not finalized yet. Please see user news for announcements of future reservations.


-TACC Team

Original Posting

LoneStar5 will not be available from 8 a.m. to 5:00 p.m. (CT) on Tuesday, 29 August 2017 due to maintenance. 

Lonestar5 Maintenance 1 August 2017

Posted by Sergio Leal on Jul 23, 2017 9:27:18 PM

Lonestar 5 will not be available from 8:00 a.m. to 5:00 p.m. (CT) on Tuesday, 1 August 2017. System maintenance will be performed during this time

Updated on Aug 2, 2017 2:50:04 PM

We are presently testing a resolution to the problems occurring between the external network (e.g. internet, license servers), and LS5 compute nodes. Please let us know if any further issues transpire. Thank you very much for your patience during this extended maintenance period.  

Updated on Aug 1, 2017 8:07:50 PM

LS5 has been returned to production. We apologize for the delay. Unfortunately the rsip service error was not resolvable within a reasonable time-frame and so the rsip errors persist. This means that some compute nodes are still unable to access outside IP addresses. We are able to make some changes towards resolving this while the system is running so please watch user news for updates to this service

Updated on Aug 1, 2017 5:08:32 PM

LS5 is still experiencing issues relating to the rsip server setup. We estimate that this can be solved within a reasonable amount of time and so are extending the LS5 until 23:00.

Original Posting

Lonestar 5 will not be available from 8:00 a.m. to 5:00 p.m. (CT) on Tuesday, 1 August 2017. System maintenance will be performed during this time

Lonestar 5 Status July 25, 2017

Posted by Lucas Nopoulos on Jul 25, 2017 3:36:58 PM

Lonestar 5 has an issue with the scheduler at present - it will be resolved as soon as possible.

-TACC Team

Updated on Jul 25, 2017 3:43:14 PM

This issue has now been resolved and that running and queued jobs were unaffected.

-TACC Team

Original Posting

Lonestar 5 has an issue with the scheduler at present - it will be resolved as soon as possible.

-TACC Team

Lonestar5 status, 20 July 2017

Posted by David Littrell on Jul 20, 2017 10:50:54 AM

LoneStar5 maintenance is being extended due to technical difficulties with the upgrade process. Please see user news for updates on when they system will be returned to production.

Updated on Jul 20, 2017 3:08:32 PM

LoneStar5 has been returned to production. The queues are available; however, Singularity is not available due to kernel updates. This can and will be resolved while the system is operational and an announcement will be made when it has be restored. 

Thank you, 

TACC team

Original Posting

LoneStar5 maintenance is being extended due to technical difficulties with the upgrade process. Please see user news for updates on when they system will be returned to production.

TACC Maintenance 18 July, 2017

Posted by Jacob Getz on Jul 11, 2017 9:47:53 AM

Access to all TACC systems will be unavailable from 7:00 AM CDT on July 18 until 8:00 AM CDT on July 19 to allow for upgrades to the core network switch hardware and to perform system maintenance on the Stockyard global filesystem.   Users will have intermittent access to all TACC services and...

Updated on Jul 19, 2017 6:25:46 PM

The /work filesystem has been restored on all TACC production systems.   All held user jobs have been released from the hold and should be running or queued to run now.
 
Thank you, 

-TACC

Updated on Jul 19, 2017 9:55:21 AM

Maintenance has been extended for the Stockyard global filesystem.  An update will be posted to User News when resources are back in full production.

Original Posting

Access to all TACC systems will be unavailable from 7:00 AM CDT on July 18 until 8:00 AM CDT on July 19 to allow for upgrades to the core network switch hardware and to perform system maintenance on the Stockyard global filesystem.   Users will have intermittent access to all TACC services and systems until the core network switch upgrade is complete.  

During this maintenance window, the production systems Stampede2, Stampede, Lonestar5, Maverick, Wrangler, Ranch, and Hikari will also be down for system maintenance and unavailable to users until after the Stockyard global filesystem maintenance has been completed.   Updates to user news will be sent once network services have been restored and when the production systems are restored to normal operations.

-TACC Team

Lonestar5 Maintenance 11 July 2017

Posted by Jacob Getz on Jun 26, 2017 9:05:11 AM

LoneStar 5 will not be available from 8 a.m. to 1:00 p.m. (CT) on Tuesday, 11 July 2017. System maintenance will be performed during this time.

-TACC Team

Updated on Jul 11, 2017 12:53:20 PM

 LoneStar 5 is out of maintenance and the queues have been resumed.

Thanks,
TACC Team

Original Posting

LoneStar 5 will not be available from 8 a.m. to 1:00 p.m. (CT) on Tuesday, 11 July 2017. System maintenance will be performed during this time.

-TACC Team

LoneStar5 Maintenance July 18, 2017

Posted by Jacob Getz on Jul 3, 2017 11:30:58 AM

LoneStar5 will not be available from 2017-07-18 7:00:00 until 2017-07-20 12:00:00 (CT). This is in line with the site-wide Stockyard maintenance that was announced, however, LoneStar5 will be receiving another sizable software update similar to the one done in April. We are updating the base OS...

LoneStar5 will not be available from 2017-07-18 7:00:00 until 2017-07-20 12:00:00 (CT). This is in line with the site-wide Stockyard maintenance that was announced, however, LoneStar5 will be receiving another sizable software update similar to the one done in April. We are updating the base OS structure across the system as well as the management infrastructure to bring us up to date with Cray's current software stack.

-TACC Team

Lonestar5 Status June 28, 2017

Posted by David Littrell on Jun 28, 2017 8:34:19 AM

Lonestar5 is currently down for maintenance. Administrators are working on this now. 

Updated on Jun 28, 2017 12:33:10 PM

LS5 queues have been resumed however some components including login2.ls5.tacc.utexas.edu are still unavailable. Please use login1.ls5.utexas.edu in the interim and we are working to restore all services.

Original Posting

Lonestar5 is currently down for maintenance. Administrators are working on this now. 

TACC Sitewide Power Event 6-23-17

Posted by Jacob Getz on Jun 23, 2017 9:30:03 AM

At 1:15 AM Central Time, TACC and our facilities experienced a power outage. Every TACC system was affected. Power has since been restored. An update will be posted to User News when resources are back in full production.


-TACC Team

Updated on Jun 23, 2017 10:37:04 PM

All TACC systems and services have been restored to normal operation after the power loss this morning.  Please submit a ticket if you encounter any problems with access to TACC systems or services.

Original Posting

At 1:15 AM Central Time, TACC and our facilities experienced a power outage. Every TACC system was affected. Power has since been restored. An update will be posted to User News when resources are back in full production.


-TACC Team

Lonestar5 Status 23 June 2017

Posted by Sergio Leal on Jun 23, 2017 1:46:58 PM

Following the TACC datacenter power outage this morning, we've restored LS5 to production and the queues are open again. We were dependent on the work filesystem which took some time to restore before we could run our acceptance tests. Thank you for your patience and please submit a ticket if any...

Following the TACC datacenter power outage this morning, we've restored LS5 to production and the queues are open again. We were dependent on the work filesystem which took some time to restore before we could run our acceptance tests. Thank you for your patience and please submit a ticket if any subsystems are unavailable.

TACC status 19 July, 2017

Posted by David Littrell on Jun 21, 2017 11:02:50 AM

Access to all TACC systems will be unavailable from 7:00 AM CDT on July 18 until 8:00 AM CDT on July 19 to allow for upgrades to the core network switch hardware and to perform system maintenance on the Stockyard global filesystem.   Users will have intermittent access to all TACC services and...

Updated on Jun 21, 2017 11:22:47 AM

Jetstream will also be affected. 

Original Posting

Access to all TACC systems will be unavailable from 7:00 AM CDT on July 18 until 8:00 AM CDT on July 19 to allow for upgrades to the core network switch hardware and to perform system maintenance on the Stockyard global filesystem.   Users will have intermittent access to all TACC services and systems until the core network switch upgrade is complete.  During this maintenance window, the production systems Stampede2, Stampede, Lonestar5, Maverick, Wrangler and Hikari will also be down for system maintenance and unavailable to users until after the Stockyard global filesystem maintenance has been completed.   Updates to user news will be sent once network services have been restored and when the production systems are restored to normal operations.

Computational Science in the Cloud Institute at TACC – 7/24-28/2017

Posted by Jason Allison on May 25, 2017 2:56:56 PM

This 5-day workshop will provide participants with an end-to-end introduction to performing scientific simulations and analyses in a cloud-based environment. Participants will build their own virtual machines, setup Jupyter notebooks, learn to use APIs for provisioning and bootstrapping VMs, attach...

Updated on Jun 13, 2017 11:14:57 AM

We still have spaces available for the Computational Science in the Cloud Institute - July 24th through July 28th, 2017.  Please register ASAP to avoid missing out on this opportunity.

Original Posting

This 5-day workshop will provide participants with an end-to-end introduction to performing scientific simulations and analyses in a cloud-based environment. Participants will build their own virtual machines, setup Jupyter notebooks, learn to use APIs for provisioning and bootstrapping VMs, attach VMs to cloud and object storage, use containers for simplifying and standardizing VM deployment, and automate deployment of VMs with different tools. Participants will also learn how to use the Agave API for managing and collaborating in cloud environments.

Price for students, faculty, and academic researchers is $400.

Registration details and full agenda can be found at:
https://www.tacc.utexas.edu/education/institutes/computational-science-in-the-cloud.

Parallel Programming Foundations Institute at TACC – July 31-August 4, 2017

Posted by Jason Allison on Jun 2, 2017 3:23:57 PM

This 5-day workshop will provide participants with an introduction to developing parallel applications for modern HPC systems. Participants will learn about profiling and optimizing applications, concepts for domain and data decomposition, developing shared-memory parallel applications using OpenMP...

Updated on Jun 13, 2017 11:08:33 AM

We still have spaces available for Parallel Programming Foundations Institute - July 31st through August 4th, 2017.  Please register ASAP to avoid missing out on this opportunity.

Updated on Jun 2, 2017 3:37:23 PM

The original dates that were posted for this event were incorrect. The correct dates for the Parallel Programming Foundations Institute at TACC Institute are July 31st through August 4th, 2017.

Original Posting

This 5-day workshop will provide participants with an introduction to developing parallel applications for modern HPC systems. Participants will learn about profiling and optimizing applications, concepts for domain and data decomposition, developing shared-memory parallel applications using OpenMP and distributed-memory parallel applications using MPI, creating hybrid OpenMP/MPI applications for modern manycore architectures, and debugging parallel applications. Hands-on exercises done on the new Stampede2 supercomputer at TACC will help participants to better understand lecture concepts using concrete examples on modern hardware.

Price for students, faculty, and academic researchers is $400.

Registration details and full agenda can be found at:
https://www.tacc.utexas.edu/education/institutes/parallel-programming-foundations

Webinar: Introduction to TACC Resources for UT System Institutions

Posted by Jason Allison on Jun 6, 2017 1:51:32 PM

Wednesday, June 14, 2017 Time: 11:30am-12:15pm CT The Texas Advanced Computing Center (TACC) at The University of Texas at Austin is expanding to deliver even more computing resources to all 14 UT System Academic and Health Institutions. This initiative, funded by UT System, aims to increase...

Wednesday, June 14, 2017
Time: 11:30am-12:15pm CT

The Texas Advanced Computing Center (TACC) at The University of Texas at Austin is expanding to deliver even more computing resources to all 14 UT System Academic and Health Institutions. This initiative, funded by UT System, aims to increase research support across all UT campuses. This webinar will give a brief presentation on how UT System investigators can leverage TACC resources to advance their research. We will be answering questions after the webinar.

Questions?: Email lifesci@consult.tacc.utexas.edu

Registration:https://portal.tacc.utexas.edu/training#/session/68

Data and Information Analytics Institute at TACC – 6/19-23/2017

Posted by Jason Allison on May 25, 2017 2:48:53 PM

This 5-day workshop will introduce participants to best practices for large-scale data analysis using Python, R, and Hadoop/Spark, as well as an introduction to data management, working with databases, and machine learning. Participants will also receive introductions to current state of the...

This 5-day workshop will introduce participants to best practices for large-scale data analysis using Python, R, and Hadoop/Spark, as well as an introduction to data management, working with databases, and machine learning. Participants will also receive introductions to current state of the practice in geospatial, biomedical, and information visualization. Price for students, faculty, and academic researchers is $400.

Registration details and full agenda can be found at:
https://www.tacc.utexas.edu/education/institutes/data-and-information-analytics.

Visualizing and Interacting with Data Institute at TACC – 6/19-23/2017

Posted by Jason Allison on May 25, 2017 2:42:13 PM

This 5-day workshop will introduce participants to tools and best practices for remote and collaborative visualization of scientific data, developing visualizations using virtual reality and augmented reality interfaces, and building visualization systems like large tiled-displays. Participants...

This 5-day workshop will introduce participants to tools and best practices for remote and collaborative visualization of scientific data, developing visualizations using virtual reality and augmented reality interfaces, and building visualization systems like large tiled-displays. Participants will also receive introductions to current state of the practice in geospatial, biomedical, and information visualization.

Price for students, faculty, and academic researchers is $400.

Registration details and full agenda can be found at:
https://www.tacc.utexas.edu/education/institutes/visualizing-and-interacting-with-data.